A complete assessment of your welding cost
We analyse your welding parameters, the processes and consumables in use, the rework rate, excess deposited metal, non-value-adding activities and real productivity (cost per kg deposited).
Real results with clients
- Pulp and paper (Piracicaba, Brazil): switching from GTAW to FCAW saved BRL 300,000 (50% of the project’s total welding cost) and avoided 2 to 3 months of delay, with no increase in radiographic rejection.
- Oil and gas (Piracicaba, Brazil): switching from SMAW to GMAW-P on Inconel 625 cut cost per joint by 18% (from BRL 3,450 to BRL 2,850), eliminated radiographic rejections, reduced HAZ hardness and raised the operating factor from 5% to 25%.
What we deliver
- Assessment of the current process, parameters and consumables
- Optimised parameter development by material and process
- Training of your team on the new parameters
- Action plan with targets for cost, quality, speed and efficiency
In most cases the gain comes from process and parameter adjustment - with no need to invest in new equipment.
Frequently asked questions
Does the consulting require buying new equipment?
In most cases, no - the gains come from adjusting the process, the parameters and the consumables. Equipment investment is only recommended when the return is clearly better than what a process adjustment can deliver.
How long before results show up?
On the projects we have run, the new parameters went into production within a few weeks of the assessment, with measurable gains on the first welded batches.