An order arrived with “IEIS” and “welding plan” in the specification, and your shop has never issued these documents? It is not rare. And you cannot leave it for the end: in supply that follows Petrobras standards, the welding documentation is submitted to Petrobras inspection for approval before welding is carried out (N-2301, 5.1). In structural steel, N-293 is even more direct: tack welding and welding only start after the IEIS has been issued (5.5.10).
XP prepares the IEIS and the welding plan for your equipment, joint by joint, signed by an FBTS Level 2 (N2) Welding Inspector (comparable to a CWI in the US / IWE in Europe). You receive the package ready to submit to the client and to use on the shop floor.
A note on the term. IEIS (Instrução de Execução e Inspeção de Soldagem) is a Petrobras term for the joint-by-joint welding and inspection instruction. In English-language projects there is no document with exactly this name. Its content is normally covered by the welding plan (a welding plan or weld map with joint-by-joint instructions). It is not the ITP (Inspection and Test Plan), which is a different document. On this page, “IEIS” means the Petrobras document and its N-2301 content.
What the IEIS is
IEIS is the Instrução de Execução e Inspeção de Soldagem. The Petrobras definition is short: a written document based on a qualified WPS, which details the welding parameters suited to each joint or job and the applicable non-destructive tests, with the respective extents (N-1438, 3.61; N-268 repeats the definition in 3.8).
In practice, it is the WPS taken to the joint. The WPS gives qualified ranges, which serve many joints. The IEIS says what to do on that joint: which WPS, which groove, which pass sequence, which parameters in each pass, which preheat and which NDT must release the weld before moving on. It is the sheet that the welder, the foreman and the inspector use in front of the part.
The name comes from the Petrobras standards. ASME and AWS do not use it. The content is defined by N-2301 (Preparation of Welding Technical Documentation), in Annex E.
What the IEIS contains, according to N-2301
N-2301 Rev. F (12/2025) asks for a detailed IEIS for each joint of the job. Identical joints can be grouped, with prior approval from Petrobras, as long as traceability between the joint and the procedure is still guaranteed (E.1.2). The parameters come from the qualified WPS, within the tolerances of the qualification standard (E.1.1).
The minimum content, from E.2.1 to E.2.3:
| Block | What goes in |
|---|---|
| Identification | Drawing number and identification of the equipment, piping, pipeline or structure, with the location of the joints; individual identification of the joint or group of joints |
| Joint | Applicable WPS and PQR; groove sketch and welding symbols per AWS A2.4; base metal, diameter (if applicable) and thickness of each member; sketch of the pass sequence, also in fillet welds when there is a leak-tightness requirement |
| Parameters of each pass | Process; classification, trade name and diameter of the electrode, wire or rod; type and amperage of current; travel speed (if applicable), voltage and polarity; flux classification and brand (if applicable); type and flow rate of shielding and purge gases (if applicable); deposition technique, stringer or weaving, with the minimum or maximum bead width (if applicable); position and progression |
| Technique | Method of initial and interpass cleaning; gouging technique (if applicable) |
| Thermal | Preheat temperature and technique; interpass temperature; time, temperature and technique of postheat (if applicable); heat treatment requirement and its parameters (if applicable) |
| Inspection | Waiting time before NDT starts; type and extent of NDT and other tests, with the hold points (before or after the root, at each layer, before or after heat treatment); reference standards, including the fabrication standard and the acceptance criteria standard, with the applicable item |
| Process and approval | Process data, such as fluid, pressure class and temperature (if applicable); date of preparation and approval; full name, signature and certification number of the Level 2 welding inspector, or equivalent per N-2941 |
Note the last row. The IEIS is signed by a Level 2 welding inspector, with the certification number, and N-2301 asks for the same on the WPS, the PQR and the welder qualification record. At XP, the technical manager prepares and signs: he is an FBTS Level 2 (N2) Welding Inspector. If welding symbols are still a doubt for your team, I explain AWS A2.4 in “welding symbols: AWS A2.4 vs ISO 2553”.
What the welding plan is
The welding plan is the planning package. Under N-2301 (5.1.1), it has at least:
- a cover sheet with title, identification of the equipment or component, fabrication or construction and erection standard, Petrobras purchase order (if any) and Material Requisition (RM) number;
- an index of the documents;
- a drawing with the joints numbered in sequence, to trace each joint on the equipment, piping or structure;
- the list of joints to be welded (LJS), per Annex A;
- the applicable WPS, including repair WPS, per Annex B;
- the PQR that support these WPS, per Annex C.
The LJS is the table that ties each joint to the drawing. For each joint it lists (A.2): reference drawing, sequential number, base metal, diameter and thickness of each member, joint type, groove type, welding position, process, whether the root is accessible and the applicable IEIS.
In fabrication, the IEIS and the welding plan can be a single document, as long as both minimum contents are met (N-2301, 5.2.1, note). This is how XP usually delivers: less paper circulating and a single revision to control.
How the IEIS relates to the WPS, the weld map and the ITP
There are four documents, and each answers one question:
- WPS and PQR: does this procedure work? The PQR proves it, the WPS gives the ranges. Without a qualified WPS there is no IEIS. The difference is in PQR vs WPS.
- Welding plan and IEIS: what will each joint receive? It is decided before welding.
- Weld map: what actually happened? Who welded, when, with which consumable lot and which NDT released it. I cover it in “weld map and traceability”.
- ITP (Inspection and Test Plan): who inspects what, at each step of fabrication? N-268 defines the PIT (the Portuguese name for the ITP) as the supplier’s document, within the quality plan, that ensures the equipment is consistent with the design, the procedures and the contract documentation (3.10).
What causes the most trouble is consistency between them. The IEIS hold point must be the same as in the ITP. The NDT extent in the IEIS must match what the code requires for that joint. In a pressure vessel under ASME VIII Div. 1, this starts with the joint category in UW-3, which sets the permitted joint type and the degree of radiographic examination. I explained it in welded joint categories (UW-3). A wrong category becomes wrong NDT in the IEIS, and this usually only shows up at the audit.
When the client or the standard requires it
N-2301 does not say to issue an IEIS on every job. It says each document must be prepared when N-133, the design, fabrication, erection and maintenance standards or the contract documents ask for it (4.2). In practice, the requirement arrives by one of these paths:
- Pressure vessel for Petrobras. WPS, PQR, IEIS and welding plans per N-2301 are in the list of fabrication documents (N-268, 5.2.1 d) and erection documents (N-269, 4.2.1 t).
- Piping. Each joint must have the IEIS used identified, with sequential numbering per piping set (N-115, 4.4.2). If the site controls NDT through a computerized system, it is enough to indicate the WPS of each joint and the IEIS is waived (4.4.3).
- Structural steel. Tack welding and welding only start after the applicable IEIS has been issued (N-293, 5.5.10).
- Shutdowns and maintenance. The tests of each joint and their extents go in the IEIS (N-133, 4.11.2), with the same waiver when there is a computerized NDT control system.
- Repair. The repair is carried out per the IEIS or the WPS applicable to the repair, prepared per N-2301 based on a qualified procedure (N-133, 4.12.1).
- Your client’s specification. If the technical specification cites the Petrobras standards, the requirement applies to your equipment, even if the end client is not Petrobras.
And in ASME and AWS? Neither asks for a document called IEIS. But ASME IX says the WPS or other documents may guide the welder to comply with the code (QW-200.1(a), 2025 edition). The IEIS can be that other document. That is why it is also useful on an ASME VIII vessel and on structures, when the client asks or when the joint does not allow improvisation.
What XP delivers
- Critical review of the technical specification, the RM and the drawings: which welding documents the contract really asks for.
- Joint numbering on the drawing and a complete LJS.
- Classification of each joint: type, groove and, on an ASME VIII vessel, the UW-3 category.
- Coverage check: does each joint have a qualified WPS for the material, thickness, process and position? Where it does not, the gap shows up before it becomes a problem and goes into WPS qualification.
- IEIS per joint or per group of identical joints, with groove sketch, AWS A2.4 symbols and pass sequence.
- Parameters of each pass within the WPS ranges and the tolerances of the qualification standard.
- Thermal requirements: preheat, interpass, postheat and heat treatment, when applicable.
- NDT of each joint: type, extent, waiting time, hold points and acceptance criteria with the standard item, consistent with the ITP.
- Welding plan with cover sheet, index, drawing, LJS, WPS and PQR.
- List of qualified welders, when it is part of the scope, together with welder qualification.
- Signature of the N2 Welding Inspector, with the certification number.
- Delivery in PDF, ready to submit to the client, and revision when the design changes.
Who it is for
- Small and medium metalworking and boilermaking shops that received an order with an IEIS or a welding plan in the specification.
- Pressure vessel, piping or structural steel fabricators supplying Petrobras or a client that adopts its standards.
- Companies that already have a WPS but have never taken the WPS to the joint, and feel it in production: welders asking for parameters, foremen improvising sequences, NDT done at the wrong time.
- Shops that need to pass a large client’s audit and have no welding engineer on the payroll.
If your company does not even have the WPS yet, start with the “10-day roadmap to qualify a WPS”.
Service steps
- Document submission. Drawings, technical specification or RM, design standard and the list of your WPS and PQR. You can send them by WhatsApp.
- Critical review. We list what the contract requires, the joints of the equipment and the gaps in WPS and welder qualification.
- Numbering and LJS. Each joint gets its number on the drawing and its line in the list.
- IEIS preparation. Joint by joint, or by group of identical joints, with parameters, thermal requirements and NDT.
- Cross-check. IEIS, ITP and the NDT plan checked against each other, so that hold points and extents match.
- Signature and delivery. Final review, N2 signature and delivery in PDF for you to submit to the client. Client comments during approval go into the next revision.
- Shop floor support. N-133 asks that the welding supervisor or foreman be able to interpret and apply the information and parameters in the IEIS (4.4.3.1). We explain the document to the team and revise the IEIS when a repair or a design change appears.
Lead time
The IEIS does not depend on testing: it depends on a qualified WPS and on the design. With both in hand, XP sends an IEIS in about 2 days. For the whole equipment package, the lead time depends on:
- the number of joints and how many of them can be grouped;
- the quality of the drawings: dimensioned grooves and identified joints shorten the work;
- WPS gaps: a joint without a qualified procedure waits for the qualification;
- the client’s comment cycle during approval.
The earlier the IEIS enters the schedule, the less it weighs. The ideal is to start together with the fabrication drawing, not in the week of welding.
Why XP
- Technical manager: MSc Eng. Gustavo Ometto Lambertucci, FBTS Level 2 (N2) Welding Inspector (IS 11160), mechanical engineer (EEP), specialization in Welding Engineering (Poli-USP), MSc and PhD candidate at UFSCar.
- 17 years in the metalworking industry, about 400 WPS and more than 500 qualified welders.
- More than 12 active clients, served from Piracicaba/SP.
- The person who prepares is the person who signs. You do not get a generic template to adapt: you get the IEIS of your equipment, checked against your drawing and your specification.
To understand what an N2 inspector changes in the shop routine, read 10 reasons to have a Level 2 welding inspector. And when the equipment ships, the same documentation closes the databook. If the client asks for third-party fabrication follow-up, see inspection and expediting.
Send the drawing and the specification and receive the scope and a quote: talk to XP on WhatsApp.
Frequently asked questions
What is an IEIS in welding?
IEIS stands for Instrução de Execução e Inspeção de Soldagem, the Petrobras term for a joint welding and inspection instruction. It is a written document based on a qualified WPS that details the welding parameters for each joint or job and the applicable non-destructive testing (NDT), with the respective extents (Petrobras N-1438, 3.61). The minimum content is in Annex E of N-2301. In English-language projects, this content is normally covered by the welding plan.
What is the difference between an IEIS and a WPS?
The WPS is the qualified procedure, with ranges that serve many joints. The IEIS takes that WPS to a specific joint: groove, pass sequence, parameters for each pass, preheat and NDT. The IEIS parameters must stay within the qualified WPS and within the tolerances of the qualification standard (N-2301, E.1.1).
What is the difference between an IEIS and a welding plan?
The welding plan is the planning package: cover sheet, index, drawing with numbered joints, list of joints to be welded (LJS), WPS and PQR (N-2301, 5.1.1). The IEIS is the execution and inspection instruction for each joint. In fabrication, the two can be a single document, as long as both minimum contents are met (N-2301, 5.2.1).
What is the difference between an IEIS and an ITP?
The ITP (Inspection and Test Plan) covers the whole equipment: the inspection steps throughout fabrication and who inspects each one. The IEIS goes down to the joint level, with the type and extent of NDT and the hold points of that weld. The two must say the same thing.
Is an IEIS mandatory?
It is mandatory when the contract or the product standard asks for it (N-2301, 4.2). This happens with pressure vessels (N-268 and N-269), piping (N-115) and structural steel (N-293) for Petrobras, and with any supply whose technical specification cites the Petrobras standards. ASME and AWS do not ask for a document with this name.
Who can sign the IEIS?
Under N-2301, the IEIS carries the full name, signature and certification number of the Level 2 welding inspector, or equivalent per N-2941 (E.2.3 q). The alternative provided is for repairs found in in-service inspection and for maintenance welding, where the technical person responsible for welding at the Petrobras unit can approve (4.5, note), and N-133 has a similar recommended practice for maintenance and work managed by Petrobras (4.2.4). Work done abroad follows its own rule (N-2301, 4.6).
Do I need an IEIS for every joint?
The N-2301 rule is a detailed IEIS for each joint of the job. When there are many identical joints, they can be grouped, with prior approval from Petrobras, as long as traceability between each joint and the procedure is still guaranteed (E.1.2).
Does the IEIS have to be approved before welding starts?
Yes, in Petrobras supply. The N-2301 welding documentation is submitted to Petrobras inspection for approval before welding is carried out (5.1). In structural steel, N-293 says that tack welding and welding only start after the applicable IEIS has been issued (5.5.10).
Can I use an IEIS on an ASME VIII vessel or an AWS D1.1 structure?
Yes, and it is often worth it. ASME IX says the WPS or other documents may guide the welder to comply with the code (QW-200.1(a), 2025 edition). The IEIS can be that other document: it removes parameter doubts from the shop floor and defines the inspection of each joint in advance.
How long does it take to prepare an IEIS?
With the qualified WPS and the design in hand, XP sends an IEIS in about 2 days. For equipment with many joints, the lead time grows with the number of joints, the quality of the drawings and the client's approval cycle. A joint without a qualified WPS waits for the qualification.